Day 28 (work days since Framing started) |
|
Sept. 30, 2009 |
- Most of the windows & sliding glass doors were delivered.

- Signs of activity in the Electrical Department

- Temporary Stairs to the 2nd floor going in.
 |
|
|
Day 27 |
|
Sept. 29, 2009 |
Nothing new today. |
|
|
Day 26 |
|
Sept. 28, 2009 |
- Wrap Around Porch started, along with the Old Porch Dog training
program.


- Dormer window in the F.R.O.G
|
|
|
Day 25 |
|
Sept. 25, 2009 |

- Medium Bronze 24 gauge standing seam metal roof ordered (on
Monday actually)
- Windows and doors have arrived at the lumber yard. Probably a few more weeks before
they are installed.
|
|
|
Day 24 |
|
Sept. 24, 2009 |
 |
|
|
Day 23 |
|
Sept. 23, 2009 |
 |
|
|
Day 21 & 22 |
|
Sept. 21 & 22, 2009 |
No pictures, sorry. Was in KC on Monday and had a Headache from
H3LL on Tuesday, however work progressed. |
|
|
Day 20 |
|
Sept. 18, 2009 |

- Skylight in upstairs bathroom


- F.R.O.G. (Finished Room Over
Garage) This will be a Study for a few years, and then can be
converted to a Bedroom or Playroom.

 |
|
|
Day 19 |
|
Sept. 17, 2009 |
 |
|
|
Day 18 |
|
Sept. 16, 2009 |
No new construction today. The crew had a funeral to go to today.
- ADT came out and got all squared away.
- Co-Mo installed a bigger transformer and new meter box.
The old meter was across the road with the barn meter.
|
|
|
Day 17 |
|
Sept. 15, 2009 |
 |
|
|
Day 16 |
|
Sept. 14, 2009 |

 |
|
|
Day 15 |
|
Sept. 11, 2009 |
- Electrical Supplies Arrive - 400 amp service



|
|
|
Day 14 |
|
Sept. 10, 2009 |

- Lots of work went into getting the footings ready for the 2
story deck.
 |
|
|
Day 13 |
|
Sept. 9, 2009 |
No stairs mind you, I climbed a ladder to get these shots. But
once I got there, it was AWESOME! The view was spectacular!
The breeze was very nice also.
- View to the left, looking out from 2nd floor Great Room, which
is actually 3 stories high on the back side.

- View from the 2nd floor Great Room, again, this view is 3
stories high. The pond will be in the draw where the first row
of trees are. There will also be a deck on this level.

- Looking at the 2-Story Foyer from the 2nd floor balcony.

- Looking at one of the Guest Rooms. Probably the "pink"
room for our grand-daughters and niece.

 |
|
|
Day 12 |
|
Sept. 8, 2009 |
 |
|
|
Day 11 |
|
Sept. 7, 2009 |
Another benefit of Amish builders, they work on Labor Day :-)

- 2 Story foyer, looking up to the balcony
 |
|
|
Day 10 |
|
Sept. 4, 2009 |
Rain, Rain, Go Away......

Before the rain, a few more floor joists went up. In the next
picture, you can see that you can look through the front door, out the
picture window on the back wall.
 |
|
|
Day 9 |
|
Sept. 3, 2009 |
 |
|
|
Day 8 |
|
Sept. 2, 2009 |
- Trusses Ordered
- Pressure tank set in house.
- Tray ceiling in the master bedroom.
 |
|
|
Day 7 |
|
Sept. 1, 2009 |

- Windows and exterior doors ordered.
|

|