Day 109 (Work days since Framing started + 15 work days for
foundation) |
| Jan. 28, 2010 |
- More Electrical. Things progressing nicely on the lower
level.
- Fired up the furnace for the first time today. It is
temporary until we are ready for the Geothermal.
- More Finish Drywall upstairs
- More Hanging Drywall Downstairs.

- View from Kitchen towards Dining Area. Opted
against a formal dining and a formal living room. This
just made more sense for the way we would use the space.

- View into the family room

|
|
|
Day 108 |
| Jan. 27, 2010 |
- More Electrical
- More Finish Drywall upstairs

- More Hanging Drywall Downstairs. This is shot from the
dining room to the family room.

|
|
|
Day 107 |
| Jan. 26, 2010 |
- Visited the cabinet maker today. So far they look great!

The big piece is for the Frig & Freezer. Cabinets across the
top and the left are spice and oil racks, which will be next to the
stove top.
The other taller piece to the left of this piece, is the pantry that
will be over by the coffee center. I will also have a big pantry
in the laundry room area.

This center piece is the bottom of the coffee center

This piece will have the stove top on the right side. Above the
left cabinets will be the microwave

Far left is the piece that will house the microwave with cabinets on
top.
Next are the cabinets that will be to the right of the sink
Next is the piece that will have a cutting board and some storage
baskets. This is left of the sink.

This is the piece for the double oven. Was suppose to have a
warming drawer but it didn't get sent, so decided I didn't need it
anyways, so more storage instead

Sitting on the top are the cabinets to the right of the sink.
Sitting on the bottom is the piece that will go above the coffee
center. The cut out on the bottom right corner is for the little
frig that is for things like creamers etc. I guess it is actually
a wine frig.

This will be the island. Then my camera was full (I forgot to
put the sd card back in)
- More Electrical - Furnaces are ready to fire up, probably in the
morning. Rough-in has moved to the lower level. Yeah!
the home stretch!
- More Drywall
 |
|
|
Day 106 |
| Jan. 25, 2010 |
- More Electrical
- This is like a communications hubb of some sort - satellite,
internet, security camera, light switch to the Christmas lights is
there also I think. I don't really "get" this corner
but David does, so it's okay. This will be housed in
the cabinetry around the fish tank.

- More electrical in the kitchen area.

- Downstairs electrical starting to show signs of progress

Foyer side
This is the kitchen/pocket office side, which will be built into the
cabinets.
Built in desk side, opposite fish tank. Round work table in the
middle
- Various views across the kitchen

- Few taped and mudded (?) drywall shots.

|
|
|
Day 105 |
| Jan. 22, 2010 |
- More Electrical - Good news though, the main floor is complete
except for the media corner. YEAH!!
- Hanging drywall continued on main floor.
- Finish drywall should start on Monday upstairs! Yeah
again!
|
|
|
Day 104 |
| Jan. 21, 2010 |
- More Electrical
- Kitchen power wall. Right to left - Frig, Freezer, Stove,
microwave, Double Oven. Black tubing is RO tubing for the pot
filler over the stove.

- More Drywall

- Kitchen Arch and Family Room Arch
 |
|
|
Day 103 |
| Jan. 20, 2010 |
- More Electrical

- Getting ready to fire up the furnace.

- Fireplace again, just because it is so pretty :-)

- Lots of ceilings popped up all over the place






|
|
|
Day 102 |
| Jan. 19, 2010 |
- Electrical continued on main floor but about to wrap it up.
Electrician said that we will have 5 miles of wire in this house.
- Some pics of the spray foam from the other day.

- The blower was installed in the fireplace.

- Blew some Cellulose into the Attic

- Started drywall in the tray ceiling in the master
bedroom
 |
|
|
Day 101 |
| Jan. 18, 2010 |
- Electrical continued. Got the fireplace fired up today.
Yeah! But it was turned off when I got there.

- Lots of little things were done to get ready for drywall,
probably on Wednesday. Stairs were framed up. Fish tank
was framed up. Pocket door for the Kitchen pocket office was
framed up.

- Few columns were wrapped on back porch
 |
|
|
Day 100 |
| Jan. 15, 2010 |
- Spray Foam is Complete on the Main Floor! It looks
AMAZING!
- Electrical
also continued. Probably another week yet on the main floor before
electrical is complete. I think on the lower level, we will just
use flashlights and lanterns.
|
|
|
Day 99 |
| Jan. 14, 2010 |
- Fireplace electrical was wired.
- Getting ready to spray foam main level tomorrow.

- Drywall almost complete upstairs. The hanging part that
is.

- Was so happy to see the dozer working this morning. Then
when I came back later, and as I walked around the edges, it really
hit me hard. This is the last step in the demolition, finish
covering up the old house. It was very very sad for me.

|
|
|
Day 98 |
| Jan. 13, 2010 |
- Propane tank for Fireplace. It will pretty much be
concealed by the stairs landing.


 |
|
|
Day 97 |
| Jan. 12, 2010 |
- More ROCKING upstairs. Might be complete tomorrow?


- Bathroom w/ W/D around the corner



- Kitchenette/Bar off Family Room

- View down the Hall from Family Room. Kitchenette on right,
Bathroom on Right, Guest Room on Left, step down into F.R.O.G. with
closets on left, mechanical room on right, then the rest is the
study.

- Most of the Interior Lights. Still have to figure out
where I put about 6 of them, and still need to buy half a dozen or
so.

- Most of the Exterior Lights

- Morning Sunshine

- Rough-In Plumbing Complete
- Rough-In Electrical Continues on Main Floor
|
|
|
Day 96 |
| Jan. 11, 2010 |
- Rough in electrical continued on main floor.
- Spray foam in the upstairs family room, the 2 story foyer and
north wall. It looks FANTABULOUS! So nice and toasty
upstairs.

- Things are Rocking in the F.R.O.G!!! This is the reading
nook.

- This is one of the doors that was ordered to see how the closet
door switch was going to work inside the door jam. Theory is,
door opens, light turns on. Door closes, light goes off...
Interesting concept.
 |
|
|
Day 92 - 95 |
| Jan. 5 - 8, 2010 |
- Rough in electrical continued on main floor
- Finished the pink stuff on upper level
|
|
|
Day 91 |
| Jan. 4, 2010 |
- Rough in plumbing continued on lower level and outside spigots
- Rough in electrical continued on main floor and extra CAT 5
lines upstairs
- Insulation in FROG
- Finished ceiling and hanging drywall in garage
 |
|