Day 130 - 132 (Work days since Framing started + 15 work days for
foundation) |
| Feb 24 - 26, 2010 |
Main Floor Lights
- Main Floor Living Room (informal)







Flooring on Main Floor





Some Upstairs Doors and Base Board Trim
More upstairs

Cabinets at the shop

Master Bath Waterfall faucet

|
|
|
Day 129 |
| Feb 23, 2010 |
Sorry no pictures. But...........
- More Lights going up
- Floors finished upstairs
- Floor trim going on upstairs
- Doors going on upstairs
- Floors started on main floor
- More doors painted
- Hole dug for septic tank being delivered in the morning
- Last of the spray foam was sprayed in the floor joist between
lower and main level.
|
|
|
Day 128 |
| Feb 22, 2010 |
Doors, Doors, and more Doors

Floors, Floors, and more Floors

Sconces in the back foyer/stair hall

Another sconce by the master closets

Power Plant in the basement

Andy playing in the mud

One door hanging

Chalkboard under the Bar

|
|
|
Day 127 |
| Feb 19, 2010 |
Okay, here we go, some upstairs lights.
- Upstairs Loft Family Room





- Pink Guest Room (no light bulbs, I bought the wrong kind)


- Reading Lights over Braydon's Bunk Beds


- Upstairs Deck (fan blades are made from sail canvas)

and Drum Roll Please.........................
- Sconce Lights in the Foyer. Absolutely Gorgeous!!!

- Lights started going in the Master Bathroom

- Magnetic Chalkboard on the Bar around the kitchen sink

- Soundproofing between the rooms downstairs.
- More Trim Painted
|
|
|
Day 126 |
| Feb 18, 2010 |
Sorry no pictures. I have been helping out during the day, and
then not remember to take pictures before I leave. But...........
lots of stuff happening.
- Ceiling fan and porch lights on the 3rd story deck.
- Foyer Sconce lights starting to appear
- Soundproofing happening between the lower level and main floor.
|
|
|
Day 124 & 125 |
| Feb 16-17, 2010 |
- More Lights, More Plug-Ins, More Switches
- Upstairs is for the most part done in the electrical
department. At least done for now. Will hang vanity
light once the vanity goes in.
- Main floor is finished painting
- Started painting more trim
- Started hanging more insulation on lower level.
|
|
|
Day 123 |
| Feb 15, 2010 |
- More Lights, More Plug-Ins, More Switches

- Sconces in Braydon's room over Bunk Beds


- LED Built-in Night lights

- More Painting. Almost finished with Main Floor
|
|
|
Day 122 |
| Feb 13, 2010 |
- More Lights, More Plug-Ins, More Switches
- These pics are for Cadye and Chloe - Grandpa putting the ceiling
fan together for the Pink Guest Room.

|
|
|
Day 119 - 121 |
| Feb 10 - 12, 2010 |
- Basement rough-in finished. Yeah!!
- Switches, Plugs, and Lights going in Upstairs. Yeah!!
- Frog Hall, and Kitchenette

- Bathroom light/exhaustfan/nightlight

- Reading Nook in the Frog Study

- Pink Room - I know, it's not pink but it will make sense.
Hopefully.


- This is the backside of the bar in the kitchen. The black
paint is Magnetic Paint. Then both the black and the white
will be painted with black chalkboard paint.

- The camera doesn't take very color accurate pictures, but I will
post anyways. This is the master bedroom

- This is the main floor family room. Again, the color is
off.

|
|
|
Day 118 |
| Feb 9, 2010 |
|
|
|
Day 117 |
| Feb 8, 2010 |
- No pictures but lots of progress.
- Electrical continues
- Flooring upstairs started
- Trim being painted
- Priming started on Main floor
- Painting completed upstairs
|
|
|
Day 116 |
| Feb 6, 2010 |
- Drywallers came to finish up the drywall on the main floor.
It looks great!!
I have misplaced my camera, so these are cell phone shots

- Electricians came in to hang the chandelier!! It looks
amazing even with cell phone pictures.

- Some downstairs electrical

 |
|
|
Day 115 |
| Feb 5, 2010 |
- More Electrical on the lower level
- More drywall on main floor
- More Painting Upstairs
|
|
|
Day 114 |
| Feb 4, 2010 |
- More Electrical on the lower level
- More Painting Upstairs
|
|
|
Day 113 |
| Feb 3, 2010 |
- More Electrical on the lower level

- More drywall on main floor

- More Priming and Painting Upstairs
|
|
|
Day 112 |
| Feb 2, 2010 |
- More Electrical on the lower level
- More tape and mud drywall on main floor
- Spray textured drywall upstairs
 


- Priming started upstairs late afternoon

|
|
|
Day 111 |
| Feb 1, 2010 |
Well here we are - February.... I think I see a light at the end of
the tunnel. Just hoping it isn't a train.
- More Electrical. I think the rough in on the lower level
will wrap up this week. Electrician said this morning that we
have somewhere around 500+ openings. Electric boxes, light
boxes, sconces, closet switches, satellite hook-ups, CAT-5....
Took WAAAAAY longer than any of us ever imagined. At least
longer than I ever imagined but it is being done right and it will
be wonderful when it is finished.

- More mud and taping on the main floor. Tomorrow the
upstairs should get textured.
 |