  Day 90 (work days since Framing started)
Dec. 31, 2009
  • More Electrical work on the main floor
  • Sprayed a little foam upstairs

  Day 89
Dec. 30, 2009
  • More Electrical work, including getting the porch lights ready to hang.
  • Misc. this and that inside.

  Day 88
Dec. 29, 2009
  • Plumbers were here, finishing up some rough-in. 
  • More electrical on the main floor.
  • Little clean up upstairs, getting ready for spray foam tomorrow.
  • More insulation, etc in garage.

  • Dozer moved some brush & dirt in order to bring the drains out of the house for the septic and geothermal.

 

  Day 87 (since framing)
Dec. 28, 2009
  • Plumbers were here, finishing up some rough-in
  • Electricians wrapped up the upstairs.  It has it's own breaker box.  Continued rough-ins on the main floor.

  • The gray conduits are for communications that run from the basement up 3 stories to the attic.  The left currently houses things like satellite, telephone, etc, with room left over.  The right is empty and in place for any future expansion.

  • We have a garage door!

  • We have some insulation going in upstairs!  If I understand correctly, this will also have cellulose blown in on top, with spray foam in various other places.

  • Various other things like garage ceiling, trim on front porch, setting posts on back for stairs, etc.
  Not a Work Day, but some snow and sunshine
Dec. 27, 2009
  • The Pirates secret hide-away.  Aaaaargh!

  Day 86
Dec. 24, 2009
  • Some electrical
  • Some other stuff too like garage ceiling, front porch, brick, stone work...

 

  Day 85
Dec. 23, 2009
  • More Electrical
  • More ADT
  • More Porch
  • More Brick
  • More Stone
  • More Rain...

 

Here are a few shots in the dark, literally

 

  Day 84
Dec. 22, 2009
  • Finishing touches on upstairs electrical - things like wiring for the closet door switches (that turn on the lights automatically when the door is opened) and satellite cables to bedrooms. 

Nothing new outside but here is a little morning sunshine

 

  Day 83
Dec. 21, 2009
  • More electrical..........
  • ADT prewired today

  • This is the ceiling over the front porch.  It is Beautiful!

  • More porch ceiling

 

  Day 82 (since framing)
Dec. 18, 2009
  • Pulled the electrical through the conduit up to the meter.  Far left of the electrical boxes will be a media box.

  • Views from 3rd floor deck

  • Here are some pics for the grandkids to enjoy, and anyone else too :-)

  • Few more pics

 

  Day 81
Dec. 17, 2009
  • Rolled out the roof for the porch!  Also rolled out the last piece or two of the roof on the back.

  • More stone work

 

 

 

 

  • Electrical continues upstairs
  Day 80 (since framing started)
Dec. 16, 2009 All electrical work today.  DISH prewired today also.

Here are a couple of morning shots with a little bit of sunshine

  Day 79
Dec. 15, 2009
  • Little brick action

  • Little siding action on the upper deck

  • Little porch ceiling action

  • Little siding action on the back

  • Little barrel action on the front porch

  • Rough-In electrical continues on the upper floor
    • It has it's own breaker box

     

    • 7 sconces all the way around the 2 story foyer

 

  Day 78
Dec. 14, 2009 No pics, sorry.
  Day 77
Dec. 11, 2009 More misc this and that
  • More Stone

  • Drywall in Garage

  • Siding started on Lower Level (and almost finished!)

  • Electrical continued.  Should be done with the top floor by Tuesday.

 

  Day 76
Dec. 10, 2009 More misc this and that
  • Lower Level Bar framed in

  • More Kitchen/Sink Bar framed in

  • Back Porch

  • Garage Insulation

  • This wasn't done today, but it has been too cold for me to snap a picture

  Day 75
Dec. 9, 2009 For the most part, doing some misc framing on the lower level today.
  • This is Adam's closet, which is up against the bathroom wall.  The square is like a little laundry door, so that all he has to do is open the door, put his clothes in, and they will fall into a clothes hamper in the closet.  The idea is of course, there will be no excuse not to pick his dirty clothes up off the floor.  Let's see if this theory works and for how long ............

  • This is another small bedroom off the poker/card table room.  Most of the guest bedrooms are small, especially those on the lower level.  Just a sleeping room really, big enough for a bed and a small closet.

  • This was actually done yesterday, but I just noticed it today, the siding on the back side.

  • This was a couple days ago also, but another angle.  This was roughed in just enough for the kitchen sink plumbing.  There will be a farm sink and more bar needs to be built yet.

  • Pond is at a stand still

  Day 74
Dec. 8, 2009
  • This is what 12,000 pounds of flooring looks like

  • More Stone

  • Getting ready for ceiling on the porch.  It will be some sort of soffit type stuff.

  • More work on upper deck.  All the columns on the porch will be wrapped like this.

  Day 71 - 73 (since framing started)
Dec. 3 - 7, 2009 Lots of activity today.  Lots of progress made
  • Reverse Osmosis fella was here today and he ran all the lines for all the RO's which include upstairs kitchenette, downstairs bar, and the freezer, potfiller, kitchen sink & coffee sink in the kitchen.
  • Electricians were here today making lots of progress also.
  • Plumbers were here working on rough-ins
  • Well pump fellas were here working on the new horse waterer.  Over the weekend Andy ran the line from the new well over to the other well water line.
  • Two dozers were working on the pond over the weekend.
  • Amish fellas worked on stone, siding, back deck trim, upper deck trim, and misc this and that.

 

  Day 70
Dec. 2, 2009
  • Rough-In PLUMBING continues
  • More Stone, more this and that on the inside

Morning Sunshine

  Day 69
Dec. 1, 2009
  • Rough-In Electrical continues
  • More Siding, More Stone, and today some Brick!!

 