Click any thumbnail for a larger image.
|
|
Day 6 (since Framing started) |
|
August 31, 2009 |

- Fireplace with Window on each side.
- 1st floor bathroom, mudroom/laundry room

- View from Master, about where sitting up in bed would be.
Pond should be dug in about 2 weeks.

- Windows and door openings were double checked for sizes,
direction to slide or open, etc.
|
|
|
Day 5 of Framing |
|
August 28, 2009 |
 |
|
|
Day 4 of Framing |
|
August 27, 2009 |
 |
|
|
New Well |
|
August 27, 2009 |

- Dug new well for house. The old well will be used for
Geothermal Ground Source Heat/Air. The new well would also be
able to handle the system if ever needed.
|
|
|
Day 3 of Framing |
|
August 26, 2009 |
 |
|
|
2nd Day of Framing! |
|
August 25, 2009 |
 |
|
|
1st Day of Framing! |
|
August 24, 2009 |
|
|
|
Front Porch is poured |
|
August 21, 2009 |
|
|
|
Forms for Back Patio |
|
August 21, 2009 |
 |
|
|
Basement floor is poured |
|
August 14, 2009 |
 |
|
|
Getting ready for front porch |
|
August 13, 2009 |
 |
|
|
Getting ready for basement floor |
|
August 13, 2009 |
 |
|
|
Garage Floor/Safe Room Ceiling goes in |
|
August 13, 2009 |
|
|
|
Ready to Pour Garage Floor/Safe Room Ceiling |
|
August 12, 2009 |
 |
|
|
Rough In Plumbing |
|
August 12, 2009 |
 |
|
|
Footings for Front Porch |
|
August 12, 2009 |
 |
|
|
Marked Front Porch |
|
August 11, 2009 |
 |
|
|
Poured Safe Room Floor |
|
August 11, 2009 |
 |
|
|
Rocks on top of Drain Pipe |
|
August 11, 2009 |
 |
|
|
Waterproofing & Drain Pipes |
|
August 11, 2009 |
 |
|
|
Removing Forms |
| August 10, 2009 |
 |
|
|
Pouring Walls |
August 7, 2009 |
 |
| Delivery Truck leaving town house after
dropping off Steam shower. Yours truly pulled him out :-) |
 |
August 6, 2009 |
 |
|
|
Forms |
| August 5, 2009 |
 |
August 4, 2009 |
 |
|
Foundation Begins |
Footings |
August 3, 2009 |
 |

|