Final Floor Plan -

This is pretty much it.  Few minors here and there, well few majors too I guess, but this is close.     

 

 

 

   

  • 1st floor changes
    • Garage bathroom is now a storage/utility closet accessible from the laundry room.
    • The office doorway off the foyer is now an in-wall fish tank.  The office is now a kitchen office, accessible from the kitchen side.  The kitchen cabinets will extend into the office area with a built in desk on one side & a built-in fish tank on the other side, and a desk/table in the middle.
    • The kitchen pantry area is now a coffee center with a smaller wall pantry.
    • There is a pocket shoji type door between these two spaces.
    • The wall between the foyer and great room was shifted to the other end.

     

  • 2nd floor changes
    • The bathroom was increased and also includes laundry and steamshower area.
    • Closet and door was reversed in the guest room, with the closet being made smaller in order to accommodate a hall closet from the other side, about where the original doorway is located.
    • The w/d utility room is now the kitchenette with a bar into the family room.
    • The furnace/utility room has been moved to the end of the hallway space.

     

  • Basement changes.
    • Made a few changes with the bar & exercise room but tired of typing.

 

 

 

 